The agenda for this meeting is available here.

Problem Review Board Members present (x=absent/excused):
x-Jim Mather                    x-Doug Sisterson
x-Raymond McCord                  Jimmy Voyles
x-Randy Peppler                   Richard Wagener
  Robin Perez
I. Discussion of PIFs for assignment
P080226.1	 SGP/RSS/C1 - Stability and nonlinearity corrections
Discussion: Actions: OK Assign To: Kiedron CC: Harris, Hartsock, DQO, McCord, Keck, Eagan, Nelson P080228.1 NSA/SGP/TWP/SONDE - Occasional incorrect surface values of T/RH
Discussion: Actions: OK Assign To: Keck CC: Holdridge, Ritsche, Rusk, Jones, Nitschke, REPO, DQR P080228.2 SGP/EF/C1/B1 - duplicate time records with different data
Discussion: Actions: OK Assign To: Perez to investigate and decide what to keep CC: Martin, Keck, Cook, Ritsche, Morris, Hodges, Harris, Hartsock, McCord, Eagan, DQO P080228.3 FKB/AERI/M1 - Contains Inf
Discussion: Robin had also noticed some Infs in AERI reproc task Actions: OK Assign To: Turner, to determine cause and direct Brian to modify ingest if appropriate CC: Martin, Keck, Ermold, McCord, DQO P080228.4 SGP/AOS/C1 - Contain Inf and NaN values
Discussion: Actions: OK Assign To: Jefferson to determine cause and direct Annette to modify ingest if appropriate CC: Martin, Keck, Koontz, McCord, DQO
II. CARs submitted for PIF closure
C080228.1      Submitted by Robin Perez for
    P080124.2	 SGP/SIRS/C1/E21 - Reprocess: Inconsistent DOD
      Discussion:
      Actions: OK

C080228.2      Submitted by Nicole Keck for
    P080212.1	 NSA/SGP/TWP/SONDE - Reprocess: Occasional incorrect surface values of
		    T/RH
      Discussion:
      Actions: OK, Robin will close RID-480

C080228.3      Submitted by Nicole Keck for
    P080221.1	 NSA/SGP/TWP/SONDE - Reprocess: Occasional incorrect surface values of
		    T/RH
      Discussion:
      Actions: OK, Robin will close RID-481

C080228.4      Submitted by Robin Perez for
    P080222.1	 TWP/SKYRAD/C1/C2/C3 - Reprocess: Missing case and dome temperatures in
		    some skyrad60s b1 level data
      Discussion:
      Actions: OK

III. Attachments
A080201.1.2    Submitted by Tonya Martin for
    P080201.1	 NSA/MWRP/C1 - Files contain NaN values
      Discussion:
      Actions: OK, reassign PIF to Cadeddu to determine cause of this
                 problem, ask Nicole to stop sending bad data to archive.

A080214.2.3    Submitted by Richard Eagan for
    P080214.2	 SGP/EF - Time-synching protocol problems
      Discussion:
      Actions: OK

IV. DQRs
D070503.2           SGP/SWATS/E10 - Instrument problem
      Discussion:
      Actions: hold, Robin to talk with John

D070514.5           FKB/AERI/M1 - Unknown
      Discussion:
      Actions: hold, this is directly from DQPR, Dave Turner will
          discuss with Denny

D071026.2           SGP/SWATS/E12 - Instrument logger problem
      Discussion:
      Actions: hold, directly from DQPR, Robin to talk with John

D071218.1           FKB/AOS/M1 - failed neph motor
      Discussion:
      Actions: hold, Robin to talk with Anne

D080222.3           NSA/SKYRAD/C1 - IRT mirror heater failure
      Discussion:
      Actions: OK, link DQPR-1887
      CC: Morris, Verlinde, Bahrmann, Richardson, DQO


    Review of Open-Ended DQRs:

    Review of Warehouse DQRs:

    Review of DQRs on Hold:


V. Overviews of Problems
       Instruments - Jimmy Voyles
       ARM Operations - Doug Sisterson
       Engineering - Jim Mather
       Archive - Raymond McCord
       Data Quality Office - Randy Peppler
       Problem/Data Quality Reporting - Robin Perez
       External Data Center - Rick Wagener
          DQO would like to assist IM as much as possible in drafting
          and submitting DQRs but without taking the ultimate
          responsibility for the DQRs away from the IMs.  Rick email
          the suggestion that DQO should feel free to submit a DQR,
          the submission would be copied to the IM, the IM would have
          until the next PRB meeting to review the submission and make
          corrections if necessary, when corrections are made the
          submitter will change to the IM, otherwise and if the PRB
          OKs the submission the DQR will go in as is. 
	  To be discussed further with IT and DQO at STM.          

VI. Review of Special Data Holdings