The agenda for this meeting is available here.

Problem Review Board Members present (x=absent/excused):
Jim Mather                    x-Doug Sisterson
Raymond McCord                  Jimmy Voyles
Randy Peppler                   Richard Wagener
Robin Perez
I. Discussion of PIFs for assignment
P080121.1	 NSA/METTWR/C2 -
Discussion: Actions: OK, reduce priority to 3, add subject: Reprocess: Inconsistent DOD Assign To: Perez, to investigate/initiate reprocessing CC: Shi, Ritsche, REPO P080121.2 NSA/SKYRAD/C1 -
Discussion: Actions: OK, reduce priority to 3, add subject: Reprocess: NaNs found in file Assign To: Perez, to investigate/initiate reprocessing CC: Shi, Stoffel, Gotseff, REPO P080122.1 SGP/MFRSR/E9 - Channels 415 and 673 are noisy
Discussion: Actions: OK, link D061220.33, link to both DQPRs 1686 and 1672 Assign To: Hodges CC: Hodges, Harris, Hartsock, Rusk, Voyles, DQO P080124.1 NSA/SGP/TWP/SONDE - Occasional incorrect surface values of T/RH
Discussion: Robin to add reproc. task Actions: OK Assign To: Keck CC: Holdridge, Ritsche, Rusk, Jones, Nitschke, REPO, DQR P080124.2 SGP/SIRS/C1/E21 -
Discussion: Actions: OK, reduce priority to 3, add subject: Reprocess: Inconsistent DOD Assign To: Perez, to investigate/initiate reprocessing, make C1 reprocessing relatively high priority, needed for QCRAD and other downstream best estimate products CC: Shi, Stoffel, Gotseff, Long, REPO
II. CARs submitted for PIF closure
C080123.1      Submitted by Michael Ritsche for
    P060628.2	 SGP/SMOS/E20/E24/E27/E3/E6/E7 - Reprocess: Wind Direction Values
		    Incorrect due to Misalignment
      Discussion:
      Actions: OK, Robin will work with Mike to submit reproc. tasks
               and also add interim DQRs as needed

C080124.1      Submitted by Nicole Keck for
    P080107.1	 FKB/NSA/SGP/TWP/SONDE - Occasional incorrect surface values of T/RH
      Discussion:
      Actions: OK, Robin to close RID-465

C080126.1      Submitted by Rob Newsom for
    P060808.1	 SGP/RL/C1 - Biases in RL water vapor profiles associated with the new
		    detection electronics
      Discussion: Raymond need to make sure meta-data is in place
               when data-stream is resurrected and make it a major news item.
      Actions: OK, Robin to work with Rob Newsom to submit reproc
               task.

III. Attachments
A080115.1.1    Submitted by Michael Ritsche for
    P080115.1	 TWP/SONDE/C1 - Reprocess: Wind Data Missing
      Discussion:
      Actions: OK

IV. DQRs
D980623.1           SGP/MFRSR/E13 - Shadowband Misalignment
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D981112.1           SGP/MFRSR/C1 - Irradiances too high
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D990119.1           SGP/MFRSR/E13 - Shadowband Misalignment
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D990517.1           SGP/MFRSR/E13 - Shadowband Misalignment
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D000604.1           SGP/MFRSR/E13 - Spikes in direct and diffuse data
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D000610.1           SGP/MFRSR/C1 - A/D Converter locked up
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D010831.9           SGP/MFRSR/E13 - Shadowband Misalignment
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D010904.1           SGP/MFRSR/E13 - 415 & 500 nm channels down
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D020628.12          SGP/MFRSR/E13 - Hole in the diffuser
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D020821.2           SGP/MFRSR/C1 - Out-of-band filter leakage
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D030531.1           SGP/MFRSR/C1 - Shadowband Misalignment
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D030811.1           SGP/MFRSR/C1 - Broadband and 500nm data suspect
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D030907.1           SGP/MFRSR/C1 - Shadowband Misalignment
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D040112.2           SGP/MFRSR/E8 - Instrument problem, bad 415nm channel
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute, link D050920.1

D040904.5           SGP/MFRSR/C1 - Shadowband Misalignment
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D050920.1           SGP/MFRSR/E8 - Missing channel 415
      Discussion:
      Actions: OK, link D040112.2
      CC: Hodges, Harris, Hartsock, DQO

D051101.1           SGP/MFRSR/E11 - Instrument problem, Unknown
      Discussion:
      Actions: OK, Robin to submit a PIF for all these "waiting for
               spares" problems
      CC: Hodges, Harris, Hartsock, DQO

D051123.4           SGP/MFRSR/C1 - Missing data
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D051227.5           SGP/MFRSR/C1 - Shadowband Misalignment
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D051230.6           SGP/MFRSR/E13 - Missing data
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D060105.6           SGP/MFRSR/E13 - Shadowband Misalignment
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D060505.1           SGP/MFRSR/E13 - Shadowband Misalignment (minor)
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D061206.3           NIM/AOS/M1 - flow controller failure *** DQR IS IN WAREHOUSE
      Discussion:
      Actions: hold, Robin to talk with Anne to determine which datastreams
            and variables are affected by the problem described

D061207.2           SGP/MFRSR/E13 - Shadowband Misalignment
      Discussion:
      Actions: OK
      CC: Hodges, Harris, Hartsock, DQO

D061220.33          SGP/MFRSR/E9 - Data issue
      Discussion:
      Actions: OK, link P080122.1
      CC: Hodges, Harris, Hartsock, DQO

D070206.3           SGP/MFRSR/E13 - Shadowband Misalignment (minor)
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D070301.1           SGP/NIMFR/C1 - Tube heater not functioning
      Discussion: added end-date
      Actions: OK, ask Lynn to close all the assignments on P070220.1
          with C080109.1, link P070220.1 and DQPR 1225 
      CC: Hodges, Harris, Hartsock, DQO

D070503.2           SGP/SWATS/E10 - Instrument problem
      Discussion:
      Actions: hold, Robin to talk with John

D070531.1           SGP/MFRSR/E13 - Noisy Data
      Discussion: updated datastream/measurement pairs
      Actions: OK, do not re-distribute

D070912.1           SGP/IRT/E13 - power supply failed
      Discussion:
      Actions: hold, Robin to add missing data periods

D071031.3           SGP/IRT/E15 - power supply failed
      Discussion:
      Actions: hold, Robin to add missing data periods

D071123.1           SGP/MFRSR/E22 - Instrument noise problem, Replace Program
      Discussion:
      Actions: OK
      CC: Hodges, Harris, Hartsock, DQO

D071218.1           FKB/AOS/M1 - failed neph motor
      Discussion:
      Actions: hold, Robin to talk with Anne about variables

D080104.2           SGP/ECOR/En - Underestimation of Fluxes
      Discussion:
      Actions: reject, info has been copied to the handbook.

D080107.2           NSA/SKYRAD/C1 - Instrument cleaning effects
      Discussion:
      Actions: OK
      CC: Gotseff, Stoffel, Verlinde, Bahrmann, Richardson, DQO

D080108.1           SGP/MFRSR/E11 - Channel 500 drops out
      Discussion: data drop already captured in data QC, only occurred
          this one time for unknown reasons.
      Actions: reject

D080116.1           FKB/MWRP/M1 - Possible slight drift of V-band calibration
      Discussion:
      Actions: OK
      CC: Cadeddu, Miller, Bartholomew, DQO

D080121.2           TWP/GNDRAD/C3 - Gndrad shutdown for tropical cylone
      Discussion:
      Actions: OK
      CC: Gotseff, Stoffel, Long, Jones, DQO

D080125.4           PYE/ECOR/M1 - Flux Data Suspect For Some Wind Directions
      Discussion:
      Actions: OK
      CC: Cook, Miller, Bartholomew, DQO

D080128.1           SGP/SIRS/C1/E1/E10/E11/E12/E13/E15/E16/E18/E19/E2/E20/E21/E22/E24/E25/E27/E3/E4/E5/E6/E7/E8/E9 - Ice
      Discussion:
      Actions: OK, can reference to IMMS be changed to a link in
          suggestion?
      CC: Gotseff, Stoffel, Harris, Hartsock, DQO

D080128.2           SGP/SIRS/C1/E1/E10/E11/E12/E13/E15/E16/E18/E19/E2/E20/E21/E22/E24/E25/E27/E3/E4/E5/E6/E7/E8/E9 - Ice
      Discussion:
      Actions: reject, duplicate of D080128.1


    Review of Open-Ended DQRs:

    Review of Warehouse DQRs:

    Review of DQRs on Hold:


V. Overviews of Problems
       Instruments - Jimmy Voyles
          Discussed general instrument data quality concerns that don't
          fit in DQRs, need to be captured in data quality
          expectations in handbooks.
          Will make sure handbooks get updated.  Wants to work with
          mentors to eliminate duplicate effort.  Randy suggested
          having a mentor meeting at STM.
          Robin: Need to review reporting forms, and if we need to do away
             with PIFCARDQR we will.
	  Jim: With transition to ACRF, we are bringing in more
             non-ARMese speaking people and need to make data quality
             more accessible to them.  Need a plan. 
	  Raymond: looking at places to allow users to submit
             comments/feedback.  Might need something like that
             specific on data-quality. 
	  Jimmy: goes to IMMS when he needs to find out info on
             instrument.  Need to have concise. 
             Starting to work with Jim on RHUBC2 instrumentation.
       ARM Operations - Doug Sisterson
       Engineering - Jim Mather
          RHUBC2 is now an IOP (OSC) going to Chile in 2009 Aug/Oct., will use
          some pieces of AMF, some spares, some TBD, expect column of
          WV 0.1 mm in high desert.  AERI-ER is key, surface rad, met,
          no radar, but MPL to mask high clouds.  Goal IR in FIR, need
          extra instruments (NASA) beyond AERI-ER range.
       Archive - Raymond McCord
       Data Quality Office - Randy Peppler
          Developing tools to catch things earlier, e.g. with Radar
          DQ, will be at Radar DQ meeting (hosted by Sean Moore).
	  Norfolk STM will have a Radar meeting on Thu.
	  Will make rejected DQ-paper into Technical Report, then boil
          papers into one concise paper referring to the tech-report
          for details. 
       Problem/Data Quality Reporting - Robin Perez
       External Data Center - Rick Wagener

Rick and Jim, out next week.
Randy and Rick envious of Jim's adventure in the rarefied air, high up in the Andes, the realm of the gods in Chile and apparently some savvy potato farmers that can predict the weather well by looking at the brightness of stars. And some big astronomical observatories including some in the FIR. Jim will talk to some of those folks with their heads in the stars.